[Most Recent Quotes from www.kitco.com]

Integra Mining achieves record gold production of 100,000 ounces

Integra Mining (ASX: IGR)has achieved a gold production milestone of 100,000 ounces in early January at its Randalls Gold Project in Australia. Randalls Gold Project is the most prolific goldfield in Australia.

First gold was poured from the project in September 2010 and Integra ramped up to first commercial production in March 2011.

Managing director Chris Cairns said another significant milestone has been achieved by Integra’s operations people.

“This follows on from having been voted the Gold Mining Journal’s ‘Gold Miner of the Year’ for 2011. It is great to see the site based personnel receiving the well-deserved recognition of their industry peers,” he said.

Integra continues to unleash the potential of the Randalls project with assays last week from follow up diamond drilling at the Imperial prospect returning high grade gold-copper intersections including 6.2 metres at 13.43 grams per tonne (g/t) gold and 1.5% copper.

Highlights also included an interval of 2 metres at 31.1g/t gold and 1.3% copper.

Mineralisation at the prospect is open along strike to the north where shallow WMC-era reverse circulation drilling intercepted 2 metres at 1.8g/t from 52 metres, and to the south where there is no reverse circulation drilling for some 200 metres.

Randalls has a JORC Resource of 30 million tonnes at 2.6g/t for 2.5 million ounces of contained gold. – BullionStreet

Tags: , , , ,

Posted by on Jan 13 2012. Filed under Gold mining. You can follow any responses to this entry through the RSS 2.0. You can leave a response or trackback to this entry

You must be logged in to post a comment Login